• July 4th, 2025

    What’s Included:
    ✔ Full inspection of all Riad rooms, courtyard, and rooftop areas
    ✔ Check for signs of moisture, leaks, or structural damage
    ✔ Lock and security inspection (doors, windows, gates)
    ✔ Review of electrical, plumbing, and drainage systems
    ✔ Airing of the property to prevent humidity damage
    ✔ Debris or trash removal from outdoor spaces
    ✔ Owner reports with photos and recommendations

  • July 4th, 2025

    What’s Included:
    ✔ Full inspection of all Riad rooms, courtyard, and rooftop areas
    ✔ Check for signs of moisture, leaks, or structural damage
    ✔ Lock and security inspection (doors, windows, gates)
    ✔ Review of electrical, plumbing, and drainage systems
    ✔ Airing of the property to prevent humidity damage
    ✔ Debris or trash removal from outdoor spaces
    ✔ Owner reports with photos and recommendations